Customization: | Available |
---|---|
Usage: | Warehouse Rack |
Material: | Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High utilization Steel Structure Garret Shelving/Racking Platform
Company Information
Nanjing Victory which engaged in plan, design, manufacture, installation and consulting service of racking and other material handling system, is member of China Logistics Association, and is well-known for providing series of automated logistics systems solutions and management software.
Product Description
Steel Structure platform with flat roof on the top, suiting for big products. Round pipe and square pipe are often used to make upright. Main and secondary beams are often made of H steel.This Warehouse Steel Platform is built with heavy-duty steel column and H-shaped steel structures, providing further load capacity. Distance between columns can be increased.It can be assembled and not need to weld on the site. Different design can be provided in line with the loading capacity by selecting different material specification. It is of high intense and widely utilized, it can both store the goods and can be as office.
Steel Structure platform can be installed or dismantled freely from one warehouse ground and distance between columns is less than 6000mm.
Steel Structure platform, Height of first level is around 3000mm, and H 2500mm for second and third floor level.Loading capacity of floor can be designed to be no more than 1000kg/ square meter.
Features | |||
1 | High density of the warehouse space | ||
2 | The shelf distance can be adjusted. | ||
3 | It can be installed conveniently and easy to be delivered. | ||
4 | It can be designed to 2 or 3 levels, with accessories of the stair and goods lift and so on. | ||
Product Show
FAQ
1,Q:Are you a factory or trading company?
A:We are a factory. We are specilize in all kindly of warehouse storage rack.
2,Q:Where is your factory located? How can I visit there?
A:Our factory is located in Nanjing City,China.You can fly to Nanjing air report directly. You are warmly welcome to visit us whenever you are available!
3,Q:What is the raw material of your products?
A:The raw material of steel code is Q235.Other steel is also available to clients' requirements.
4,Q:What is the term of payment?
A:TT,L/C,Western Union are available.
5,Q:What is the delivery times?
A:In general, within 15 days after deposit.
6,Q:May I know the status of my order?
A:Yes.We will send you information and photos at different production stage of your order.You will get the latest information in time.
7,Q:How could you guarantee the products quality?
A:We have professional engineer to check what size should be used to guarantee your load weight request.
8,Q:How could I install the racks?
A:We would provide detail install drawing to teach you how to install the racks.If needed,we also could provide free engineer to teach you installation.But related cost(Flight,living and eating etc.)should be in your charge.
Please feel free to contact us if you have any interested in.